onsdag den 30. april 2014

Assemble the construction

We now have almost all the part for assembling the whole construction of the foam cutter (even the bearings, which we have bought in Stadium), so this was the schedule for today:
  • Assemble the case construction; the aluminum rods, the motors and some of the laser cut pieces.
  • Go to the workshop to get the last nuts, bolts
  • Ask some of the workshop men how it's easiest to make some small brass cylinders in 3 different sizes. The smallest ones are going to sit between the bearings, and the big ones will be places around the long ones so the timing belt can roll on them. 
  • Make something in the workshop where the timing belt can roll on around the middle aluminum rod. 
  • Assemble as much of the construction as possible

So.. We started as planned by assemble the aluminum rods and the the two stepper motors with some of the laser cut pieces. Then we went to the workshop to get the nuts and bolts and make these small cylinders seen on the picture below. We ended up making them on a lathe. Afterward we made a chamfer on each of them both inside and outside, because there was a very sharp edge on them. 


Then we went back to assembling the sliders with the brass cylinders, bearings, big bolts and the laser cut pieces. Finally we could assembly the sliders to the aluminum rods, and they slide really good! We still need to fix something the timing belt can slide on around the middle rod. We know what we will do, we just need to laser cut something in SkyLab and do some more cylinders in the workshop. The picture below shows a drawing of the solution



The plan for next time:
  • Make the last things in the workshop
  • Go to SkyLab to laser cut
  • Start programming 

Here are some pictures of the assembling process. As you can see, it is a very small cute CNC hot wire foam cutter we are making :)



Press fitting the laser cut case

Last Wednesday we went to the SkyLab to laser cut some part for the foam cutter construction and the Arduino case. We laser cut the part to the case, so it could be press fit. Even though we made them for press fit, they are still a bit loose, so we had to assemble the case with acetone.

This is how the bottom of the case looks like. Now it just need to dry for like 24 hours. The top must be able to be taken off, so we will just screw this on. We will maybe use these boxes for our Arduino in this project.




onsdag den 23. april 2014

Laser cutting day in SkyLab

Today we had our first reservation in the SkyLab, so we started the day by working on the parts we should laser cut. We had a lot of small parts for the construction that had to be laser cut, so we had to finish them in Creo, make CAD drawings, import the drawings to Illustrator to arrange the parts perfectly in the document, and last import the document to Inkscape to prepare them for laser cutting. 

Here is a picture of our PDF document of our parts 



At 13 o'clock the whole group went to SkyLab to laser cut our parts. We had difficulty finding a real acrylic sheet we could use for laser cutting. In the workshop they kept giving us a fake acrylic sheet. BUT fortunately they had 2 different kind of acrylic sheets in the SkyLab we could use. A neon yellow one with a thickness of 5 mm and a neon red one with a thickness of 3 mm. We chose the yellow one, because we liked the thickness.

This is the laser cutter in progress (yes, we called our foam cutter "Bad Ass").



After laser cutting all the pieces, we went to the workshop to collect our aluminum rods and a whole lot of screws and nuts. We still need to buy roller bearings. This we will do i Stadium.

This is all the laser cut pieces we are going to use to assemble the construction of the foam cutter. 



onsdag den 9. april 2014

Re-designing the frame

Today we showed the CAD drawing of our frame to Ali, but found out we needed to re-design it. As it looked like, we would use too much material. So we discussed in the group how we could re-design it using less material. We removed some of the rods, so it was no more a whole cube, but more like a T frame with support rods at the bottom.

Here is the result

The almost transparent part on the CAD drawing above is the parts we want to laser cut in a acrylic material. 


Now we are working on the corner brackets; making CAD drawings, deciding how they should look like, how many we will need, how we are going to produce them, which material to use etc.
We have decided to laser cut them in an acrylic material.

We still have a quite long to-do list, so we still have a lot to work on.

fredag den 4. april 2014

Deciding on the shelter and making the bow

Today Charlotte, Peter and Line met to work on the CNC foam cutter. We did some drawings of the construction and decided to make a small but robust CNC foam cutter. It will be 300mm x 300mm x 300mm. Peter will make the CAD drawing of the shelter at home, so it is ready at Wednesday.

Drawings of the construction

We also did a brainstorm of the sliders; how they should look like, how that will work etc. As you can see on the picture below we want to laser cut two square in acrylic for each slider. Between the two squares there will be four bolts where there on each one will be places a brass cylinder, a bearing and one more brass cylinder. On the outside of the acrylic sheet each bolt will be fasten with a nut. We need three of these sliders; two to slide up and down and one to slide from right to left. The one sliding from side og side will need something to attach the timing belt. 
Drawing of how we want the slider to be
We also went to the workshop to ask about the bow. Then we decided with some of the workshop men that we should make it from a 10 mm aluminum rod. One of the workshop men actually took the time to bend it for us. as you can see it is not very precise, so maybe we will need to make a new one or do something clever with this one.

The bow bended of a 10 mm aluminum rod
Charlotte and Peter